Thursday, 25 November 2010
Shooting Schedule
09/02/11 Plan to pick up equipment at 12pm and set up in the studio. Actors will arrive at 1pm and we will start shooting at 1:30 after costumes are assembled. Shoot the first 3 verses from all angles. - Studio wasn't available so we used a classroom in Southover with a greenscreen on the wall behind. 10/02/11 - 08/03/11 Capture back and edit the footage caught on 09/02/11. 09/03/11 Plan to pick up equipment at 1pm and set up in the studio with green screen. Start filming after actors have arrived at 1:30pm. Shoot the remaining 3 verses and addon shots eg. group shots with no lip syncing. Equipment List: - 3x XM2 Cameras - 2x Portable Lighting Rig - 3x Tripods - 1x Green Screen Costume: - 6x Flat Caps - Various Hoodies - T-Shirts - Chains and other various Jewelry
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment